HATEMACHINE (2019 Demo)
The second full demo I ever produced, preserved here in all its wood-chipper-production-style glory.
credits
released September 25, 2019
Vocals, Bass, Guitars, Keys, Drum Programming, Additional Narration - Scott McGowan
Contrabass Balalaika, Otamatone - Evan Williams
All music written, performed, and produced by Scott McGowan.
Album art by KOZMOGRAFX.
Scritch Player by torcado: https://torcado.itch.io/scritch-editor
license
all rights reserved
Status | Released |
Category | Soundtrack |
Author | The Evan Williams Project |
Tags | heavy-metal, metal |
Download
Download NowName your own price
Click download now to get access to the following files:
The Evan Williams Project - HATEMACHINE.zip 779 MB
Leave a comment
Log in with itch.io to leave a comment.